Product Center

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for Acp Sheet Size, Wooden Look Pvc Panel, Composite Panel Construction, You may find the lowest price here. Also you will get high quality products and excellent service here! Please do not hesitate to contact us!
Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC Detail:

AUTOMATIC FR A2 CORE PRODUCTION LINE02
AUTOMATIC FR A2 CORE PRODUCTION LINE03

Machine Main Technical Data

1. Raw material
Environment protection FR non-organic powder&Special water miscible liquid Glue&Water: Mg(oh)2/Caco3/SiO2 and other non-organic powder ingredients as well as Special water miscible liquid glue and some percentage of water for the formula details.

Non-woven fabrics film: Width: 830~1,750mm
Thickness: 0.03~0.05mm
Coil weight: 40~60kg/coil

Remark: Firstly start with 4layers of non woven fabrics film and top for 2layers and bottom for 2layers, and 2layers of them will be recoiled after conveying the core to the oven and finally the remaining 2layers will stick to the core after melting.

FR A2 CORE PRODUCTION LINE1

2. Finished composite panel
Width: 800-1600mm.
Thickness: 2.0~5.0mm.
Production speed: 1200~2000mm/min(Normally for 1800mm/min).
Calculation based on: width of 1240mm*(3~4mm) (adjust as per product’s thickness); raw material/formula/production technique/operation skill can effect the production speed.

3. Production line cooling water requirement (recycling)
Q= 0.5-1.5M3/H; P=Normally for 0.7KG/CM2, (design for 0.5~2kg/cm2 ).
Input temp T1: ≤20℃,  ≥0.3Mpa, hardness: 5-8odH.
Mainly used for powder mixing and combination of the formula and water AC cooling recycling and machine front parts-cleaning and other small quantity of recoiler magnetic brake application.

FR A2 CORE PRODUCTION LINE2

4. Total energy consumption: (230/400V)/3 phase/50HZ.
Power Supply: Installed capacity for FRA2 class: 240kw (actual energy consumption around 145kw).
Electric cabinet working environment: temp & humidity  ≤35℃, ≤95%.
Gas supply: Totally for 6ovens and about 110M3/H for the gas requirement(LPG or LNG),averagely for 78M3/H.

AUTOMATIC FR A2 CORE PRODUCTION LINE034

5. Total Compress Air volume
Q=0.5~1m3/min P=0.6~0.8Mpa
Air Consumption: Screw Type of Air Compressor with ≥1m3 air storage tank and motor of≥ 11KW

AUTOMATIC FR A2 CORE PRODUCTION LINE04

6. Size of the unit
Length* width* height (m): 85m*9m*8.5m(Front platform of the machine for 8.5m )
Total weight (approximately): 90 tons
Factory size (reference)
Length * width (m): 100*16
Crane: lifting capacity 5 tons


Product detail pictures:

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures


Related Product Guide:

Being supported by an highly developed and specialist IT team, we could give technical support on pre-sales & after-sales service for Super Purchasing for Aluminium Cladding Board - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC , The product will supply to all over the world, such as: luzern, Saudi Arabia, Amman, We provide OEM services and replacement parts to meet the varying needs of our customers. We give competitive price for quality solutions and we are going to make certain your shipment is handled quickly by our logistics department. We sincerely hope to have the opportunity to meet with you and see how we can help you further your own business.
  • Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Bruno Cabrera from Frankfurt - 2018.03.03 13:09
    We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Monica from Singapore - 2017.10.27 12:12
    Write your message here and send it to us