Product Center

Factory directly Exterior Aluminium Wall Cladding - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We usually perform being a tangible workforce making sure that we will give you the most beneficial excellent plus the finest selling price for Aluminium Composite Panel Market, Acp Sheet Quality, Aluminium Composite Panel Texture, We will supply best quality, the most market competitive price, for every new and old customers with the most perfect green services.
Factory directly Exterior Aluminium Wall Cladding - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC Detail:

AUTOMATIC FR A2 CORE PRODUCTION LINE02
AUTOMATIC FR A2 CORE PRODUCTION LINE03

Machine Main Technical Data

1. Raw material
Environment protection FR non-organic powder&Special water miscible liquid Glue&Water: Mg(oh)2/Caco3/SiO2 and other non-organic powder ingredients as well as Special water miscible liquid glue and some percentage of water for the formula details.

Non-woven fabrics film: Width: 830~1,750mm
Thickness: 0.03~0.05mm
Coil weight: 40~60kg/coil

Remark: Firstly start with 4layers of non woven fabrics film and top for 2layers and bottom for 2layers, and 2layers of them will be recoiled after conveying the core to the oven and finally the remaining 2layers will stick to the core after melting.

FR A2 CORE PRODUCTION LINE1

2. Finished composite panel
Width: 800-1600mm.
Thickness: 2.0~5.0mm.
Production speed: 1200~2000mm/min(Normally for 1800mm/min).
Calculation based on: width of 1240mm*(3~4mm) (adjust as per product’s thickness); raw material/formula/production technique/operation skill can effect the production speed.

3. Production line cooling water requirement (recycling)
Q= 0.5-1.5M3/H; P=Normally for 0.7KG/CM2, (design for 0.5~2kg/cm2 ).
Input temp T1: ≤20℃,  ≥0.3Mpa, hardness: 5-8odH.
Mainly used for powder mixing and combination of the formula and water AC cooling recycling and machine front parts-cleaning and other small quantity of recoiler magnetic brake application.

FR A2 CORE PRODUCTION LINE2

4. Total energy consumption: (230/400V)/3 phase/50HZ.
Power Supply: Installed capacity for FRA2 class: 240kw (actual energy consumption around 145kw).
Electric cabinet working environment: temp & humidity  ≤35℃, ≤95%.
Gas supply: Totally for 6ovens and about 110M3/H for the gas requirement(LPG or LNG),averagely for 78M3/H.

AUTOMATIC FR A2 CORE PRODUCTION LINE034

5. Total Compress Air volume
Q=0.5~1m3/min P=0.6~0.8Mpa
Air Consumption: Screw Type of Air Compressor with ≥1m3 air storage tank and motor of≥ 11KW

AUTOMATIC FR A2 CORE PRODUCTION LINE04

6. Size of the unit
Length* width* height (m): 85m*9m*8.5m(Front platform of the machine for 8.5m )
Total weight (approximately): 90 tons
Factory size (reference)
Length * width (m): 100*16
Crane: lifting capacity 5 tons


Product detail pictures:

Factory directly Exterior Aluminium Wall Cladding - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Factory directly Exterior Aluminium Wall Cladding - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Factory directly Exterior Aluminium Wall Cladding - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures

Factory directly Exterior Aluminium Wall Cladding - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC detail pictures


Related Product Guide:

The corporation upholds the philosophy of "Be No.1 in high quality, be rooted on credit rating and trustworthiness for growth", will continue to serve outdated and new consumers from home and overseas whole-heatedly for Factory directly Exterior Aluminium Wall Cladding - AUTOMATIC FR A2 CORE PRODUCTION LINE – BOTEC , The product will supply to all over the world, such as: Sao Paulo, Indonesia, Frankfurt, If you give us a list of products you are interested in, along with makes and models, we can send you quotations. Please email us directly. Our goal is to establish long-term and mutually profitable business relationships with domestic and overseas clients. We look forward to receiving your reply soon.
  • The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
    5 Stars By Betty from Honduras - 2018.06.18 17:25
    This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By Phyllis from Bolivia - 2017.10.13 10:47
    Write your message here and send it to us